Under 1919.73(a), when must unit proof tests of derricks be carried out?

Under 1919.73(a) unit proof tests of derricks must be carried out at the same times specified for cranes in 1919.71(a).

  • These test intervals are set by the crane inspection and testing schedule referenced in 1919.71(a).
  • Always document the test date and link it to the crane/derrick schedule required by 1919.71.

(See 1919.73(a).)

Under 1919.73(b), how much higher must the proof load be than the safe working load for derricks rated up to 20 tons?

Under 1919.73(b) the proof load for derricks with a safe working load up to 20 tons must be 25 percent in excess of the safe working load.

  • Example: a derrick with a 20-ton safe working load would require a 25% greater proof load (20 tons × 1.25 = 25 tons) unless a more conservative approach is used.

(See 1919.73(b).)

Under 1919.73(b), what is the proof load requirement for derricks with safe working loads between 20 and 50 tons?

Under 1919.73(b) the proof load for derricks with safe working loads from 20 to 50 tons must be 5 tons in excess of the safe working load.

  • Example: a derrick rated 30 tons SWL must be tested with a 35-ton proof load.

(See 1919.73(b).)

Under 1919.73(b), what is the proof load requirement for derricks with safe working loads over 50 tons?

Under 1919.73(b) the proof load for derricks with safe working loads over 50 tons must be 10 percent in excess of the safe working load.

  • Example: a derrick with a 60-ton SWL requires a 66-ton proof load (60 tons × 1.10 = 66 tons).

(See 1919.73(b).)

Under 1919.73(b), at which boom angles or operating radii must proof loads be applied during a unit proof test?

Under 1919.73(b) proof loads must be applied at the derrick's designed maximum and minimum boom angles or operating radii, or if that is impracticable, as close to those extremes as practicable.

  • The specific angles or radii used for the test must be stated in the certificate of test.
  • If you cannot reach the absolute maximum or minimum, document how close the test positions were to the design extremes.

(See 1919.73(b).)

Under 1919.73(b), what should you do if it is impracticable to apply proof loads at the designed maximum and minimum boom angles or radii?

Under 1919.73(b) if it is impracticable to test exactly at the designed maximum or minimum boom angles or radii, you must apply the proof loads as close to those extremes as practicable and state the angles or radii tested on the certificate of test.

  • Document why testing at the exact extremes was impracticable and record the actual angles or radii used.
  • Ensure the certificate of test lists the tested angles/radii so the test record is clear and auditable.

(See 1919.73(b).)

Under 1919.73(b), must the weight of auxiliary handling devices be included in the proof load?

Under 1919.73(b) the weight of all auxiliary handling devices must be considered part of the load when determining and applying the proof load.

  • Include hooks, jibs, blocks, slings, spreaders, or any other attached handling equipment in the total test weight.
  • Account for auxiliary weights in both calculation and physical setup to ensure the proof load meets the required excess over the safe working load.

(See 1919.73(b).)

Under 1919.73(b), must proof loads be swung during the unit proof test, and if so, how?

Under 1919.73(b) proof loads must be swung as far as possible in both directions during the unit proof test.

  • Swinging the load checks stability, rigging behavior, and mechanical function under dynamic positioning.
  • Record how far the load was swung and include any limitations in the certificate of test.

(See 1919.73(b).)

Under 1919.73(c), what inspection is required after a satisfactory unit proof load test?

Under 1919.73(c) after a satisfactory unit proof load test the derrick and all component parts must be carefully examined in accordance with the requirements of 1919.71(d), as far as applicable.

  • This means conducting the post-test examination items and any detailed inspections prescribed in 1919.71(d).
  • Document findings, repairs, and any items that require corrective action following the examination.

(See 1919.73(c) and 1919.71(d).)

Under 1919.73(b), what information must be stated in the certificate of test after proof loading?

Under 1919.73(b) the certificate of test must state the boom angles or operating radii at which the proof loads were applied.

  • The certificate should also record the proof load value used, the dates, and any limits on swinging or positioning encountered during the test.
  • Keep the certificate with maintenance/testing records so inspectors can verify compliance with the test positions and magnitudes.

(See 1919.73(b).)

Who must determine and approve the competent person to perform derrick proof load tests and post-test examinations?

The employer must assign or approve the competent person who performs derrick proof load tests and post-test examinations; OSHA recognizes that the employer is responsible for designating a competent person qualified to identify hazards and take corrective action.https://www.osha.gov/laws-regs/standardinterpretations/1977-04-26

  • A "competent person" is defined as someone capable of identifying hazards and authorized to take prompt corrective measures; the employer must ensure the person is qualified for the specific derrick testing and inspection tasks.
  • Document the person's qualifications and authorization as part of the testing record.

(See the OSHA interpretation on competent person designation at https://www.osha.gov/laws-regs/standardinterpretations/1977-04-26 and 1919.)

Under 1919.73(a) and 1919.71(a), can derrick proof testing follow the same schedule as cranes?

Yes. Under 1919.73(a) derrick unit proof tests must be carried out at the same times specified for cranes in 1919.71(a).

  • Follow the inspection and testing intervals established in 1919.71(a), and keep records showing the derrick tests matched those intervals.

(See 1919.73(a) and 1919.71(a).)

If a proof load test reveals defects, what actions are required under 1919.73(c) and related provisions?

After a proof load test reveals defects, you must carefully examine the derrick and its components per 1919.71(d) and take any corrective actions required by those inspection and maintenance provisions.

  • Perform the detailed examinations and document findings as prescribed in 1919.71(d).
  • Repair or remove from service any parts that do not meet acceptance criteria before returning the derrick to operation; keep records of repairs and re-tests.

(See 1919.73(c) and 1919.71(d).)

Under 1919.73(b), how should you handle the 20-ton boundary between the "Up to 20 tons" and "20 - 50 tons" proof load categories?

Section 1919.73(b) lists "Up to 20 tons" (25% excess) and "20 - 50 tons" (5 tons excess); because the wording creates an overlap at 20 tons, the safest approach is to apply the more conservative requirement (the larger proof load) and document that decision.

  • For a 20-ton safe working load, applying the 25% excess yields a 25-ton proof load (more conservative than adding 5 tons to get 25 tons in this particular case they are equal); however, when a boundary is unclear for other values, choose and document the safer option.
  • If uncertain, document the basis for your choice or consult OSHA compliance assistance for clarification.

(See 1919.73(b).)

Under 1919.73, what parts of the derrick are covered by the term "unit proof load test" and post-test examination?

Under 1919.73 the "unit proof load test" covers the derrick and all component parts thereof; after the test the derrick and all component parts must be carefully examined as required by 1919.71(d).

  • Components to consider include the boom, hoists, blocks, sheaves, hooks, wire rope, fittings, auxiliary handling devices, and structural connections.
  • Include any auxiliary handling equipment in the test weight and in the post-test inspection.

(See 1919.73(b) and 1919.73(c).)