Skip to content

Sample report

A Stepo inspection report, as it prints

Three pages from an inspection report Stepo built for a demo project: one finding with its photos and fixes, energy exposure against the last visit, and the site conditions recorded that day.

Finding IMP2, a damaged table-saw extension cord, with two photos, four completed corrective actions and two OSHA citations
Page 8 of 23
Energy exposure by control level, compared with the September 16 visit
Page 18 of 23
Site conditions recorded for the inspection: temperature, heat risk, weather alerts, wind, air quality, wildfire, flooding, seismic activity and precipitation
Page 19 of 23